Chicago has issued a $74,498,863 building permit for a major renovation and alteration at the Eugene Sawyer Water Filtration plant at 3300 E. Cheltenham Dr.
The work, overseen by general contractor IHC Construction Companies LLC, includes a roof steel restoration for the entire building, including the original 1941 structure and a 1964 addition, as well as “facade and MEP renovations.”
The roof system will include new roofing membrane, insulation, precast concrete roof planks and and expansion joints.
Key subtrades include: Electrical – The Bartech Group Inc.,; masonry – MBB Enterprises of Chicago Inc.; plumber/plumbing – Adamson Plumbing Contractor; and refrigeration and ventilation – F.E. Moran Inc.